WHY CHOOSE US?

  • We do not have an affiliation with any manufacturing factory in China: We are an independent company and carry the appropriate insurance covers for the industry in engineering and consulting.
  • Our reputation in the commercial refrigeration field dates back to 1980 with major installation projects both within Victoria and Interstate.
  • Our expertise is with commercial refrigeration installation and manufacturing giving us the knowledge of the correct build and installation methods the factories should be using on all products.
  • We utilize our commercial experience to create a better solution to the customer and a simple purchasing experience without the need for costly failures.
  • For long-term co-operation with the manufacturing factories we can also provide extra training to make the staff aware of the current build standards and applications of good practice for our industry.

LIVE TESTING IN AUSTRALIA

icon
icon

Step 1

1a: Live load testing with product. Product is to the customers build specification and not glycol M packs to simulate the conditions.

1b: Live ambient testing to comply with the customers builds specification

icon
icon

Step 2

Compliance to the standard for electrical connections. Our electrical contractor will check and certify the product deemed safe as per the electrical code.
icon
icon

Step 3

General operation build standard of components and general build quality.
icon
icon

Step 4

All live testing with full product loads to test and record pull down times, general performance of the refrigeration system at certain temperatures the customer has nominated.
icon
icon

Step 5

Full temperature reports and recommendations for the customer to submit to the manufacturer, should there be operational faults or build quality issues.

TESTING IN CHINA

icon
icon

Step 1

Manufacturing facility visits to ensure the products that are being purchased comply with the relative country standard.

1a: This will include live build inspections from the first build to the final product.

1b: Inspect the operation of installation of the refrigeration components and the installation methods applied to the appliance.

icon
icon

Step 2

Live testing of the product for compliance and operation under the lab test conditions as per the customers build specification.                             2a: Workmanship compliance while testing for failures and faults under condition.
icon
icon

Step 3

Engineering advice to the factories regarding the products and testing procedures.
icon
icon

Step 4

Full reports to the quality of the products prior to shipment. All verified testing reports and build specification reports.
icon
icon

Step 5

QA inspections prior to shipment, to comply with all packaging and transport regulations.

OUR PRODUCT TESTING GALLERY

Factory packing inspection on spare parts: Compressors all packed upside down: All 200 compressors rejected.
Factory packing inspection on spare parts: Compressors all packed upside down: All 200 compressors rejected.
Pre sales testing
Pre sales testing
Inspection of installation at factory
Inspection of installation at factory
commercial cabinet testing
commercial cabinet testing
Factory manufacturing stage inspection
Factory manufacturing stage inspection
Correct specification and serviceability of parts.
Correct specification and serviceability of parts.
Commercial cabinet testing
Commercial cabinet testing
Testing controllers that have burnt out to find the manufacturing fault.
Testing controllers that have burnt out to find the manufacturing fault.
Testing a commercial cabinet in ambient temperature a fault was found in the insulation that allowed the cabinet to externally sweat. Cost saving to the client 200k
Testing a commercial cabinet in ambient temperature a fault was found in the insulation that allowed the cabinet to externally sweat. Cost saving to the client 200k
Component testing for quality and correct specification.
Component testing for quality and correct specification.
Pre Inspection testing for ambient sweating prior to testing room application
Pre Inspection testing for ambient sweating prior to testing room application
Faulty burnt wiring within a refrigerated cabinet that caused major damage to the customers client list.
Faulty burnt wiring within a refrigerated cabinet that caused major damage to the customers client list.